Gould Thorpe Planning Pty Ltd
  • Home
  • People
    • Daniel Thorpe
    • Stephanie Hensgen
    • Susan Baker
    • Lisa Earl
    • Lauren Gardner
    • Dr Melissa Risely
    • Ruzenka Pavilk
    • Sophie Priede
    • Kellie Chadwick
    • Jessica Oxley
    • Ruby Rushforth
    • Josephine Telfer
    • Zaira Farachala
    • Carolyn Pavy
  • Services
  • Projects
    • Hamilton Reserve Upgrade
    • Level Crossing Removal Program – Ovingham and Hove
    • Regency Road to Pym Street Project
    • SA Water Capital Works Program 2020 – 2024
    • CoO Community Engagement Review
    • Eyre Peninsula Transmission Line
    • Main South Road Duplication
    • Public Transport Projects Alliance
    • CoA Community Engagement Review
    • Jetty Road Trunk Main Renewal
    • Mitcham Hills Planning Study
    • Rail Maintenance Program
    • Adelaide Hills Intersection Upgrade
    • City Bikeways Project
    • Metropolitan Intersections Program
    • Various substation and power line projects
    • Adelaide Central Reinforcement Program
    • Market District Masterplan
    • North – South Corridor Future Priorities Planning Study
    • Regional Bridges Program
    • City West Project (for the Adelaide Central Reinforcement Program)
    • Darlington Upgrade Project
    • North East Public Transport Study
    • Travel Companion Service Review
    • Adelaide Hills Region Regional Strategic Tourism Plan
    • Central Eyre Iron Project
    • Tonsley Line Review
    • Torrens Rail Junction
    • Adelaide Desalination Project
    • North Brighton to Kingston Coast Park (Design and Consultation)
    • Rail Security consultation
    • Christies Creek Upgrade – Water Proofing the South Stage 1
    • Glenelg to Adelaide Park Lands Recycled Water Project
    • Northern Connector Planning Study
    • Northern Economic Plan
    • O-Bahn City Access
    • City Tram Extension
    • SA Regional Demographic Study
    • Water Proofing the South Stage 2
    • Waterproofing Eastern Adelaide
    • AdeLINK
    • Norwood Parade Masterplan
    • Torrens Rail Junction Planning Study
    • Western Pipeline Project (Part of the North South Interconnection System Project)
    • Eastern Pipeline Project (Part of the North South Interconnection System Project)
    • Greenhill Road Safety Upgrade
    • Northern Connector Project
    • Waterloo Substation Replacement Project
    • National Broadband Network First Release Site – Willunga, South Australia
    • Rail Revitalisation Program
    • Seaford Rail Extension Planning Study
    • Electrification of the Seaford Line
    • Edinburgh Runway Extension – – Maritime Patrol Aircraft Replacement Project (AIR7000)
    • South Road Superway (Construction Stage)
    • Bus Shelter Funding Program
    • Northern Expressway Project
    • Transforming Health
    • Integrated Transport and Land Use Plan
    • Regional Mining and Infrastructure Plans
    • Northern Adelaide Demographic Analysis
    • South Road Superway Planning Study
    • Olympic Dam Expansion Environmental Impact Statement
  • Clients
  • Links/Partners
  • Contact
img

Mitcham Hills Planning Study

Client                         
SMEC for Department of Planning, Transport and Infrastructure (2019 – ongoing)

GTP Role                   
We facilitated early engagement for our client SMEC on a planning study in the Adelaide Mitcham Hills area. Community engagement formed an important part of this upgrade and we facilitated community information days and online surveys to assist SMEC in preparing a concept design. 

Outcome                    
We provided the community with an opportunity to provide feedback on intersections they use on a regular basis which provided the concept design team with valuable information to facilitate into a concert design.

Website                      https://dpti.sa.gov.au/infrastructure/road_projects/mitcham_hills_road_corridor_upgrade

LOCAL GOVERNMENT

  • Hamilton Reserve Upgrade
  • CoO Community Engagement Review
  • CoA Community Engagement Review
  • City Bikeways Project
  • Market District Masterplan
  • Travel Companion Service Review
  • Adelaide Hills Region Regional Strategic Tourism Plan
  • North Brighton to Kingston Coast Park (Design and Consultation)
  • Christies Creek Upgrade – Water Proofing the South Stage 1
  • Waterproofing Eastern Adelaide
  • Water Proofing the South Stage 2
  • Norwood Parade Masterplan

TRANSPORT AND INFRASTRUCTURE

  • Regency Road to Pym Street Project
  • Public Transport Projects Alliance
  • Rail Maintenance Program
  • Metropolitan Intersections Program
  • Regional Bridges Program
  • Darlington Upgrade Project
  • Torrens Rail Junction
  • O-Bahn City Access
  • City Tram Extension
  • AdeLINK
  • Northern Connector Project
  • Rail Revitalisation Program
  • Electrification of the Seaford Line
  • South Road Superway (Construction Stage)
  • Bus Shelter Funding Program
  • Northern Expressway Project

UTILITIES

  • SA Water Capital Works Program 2020 – 2024
  • Eyre Peninsula Transmission Line
  • Jetty Road Trunk Main Renewal
  • Various substation and power line projects
  • Adelaide Central Reinforcement Program
  • City West Project (for the Adelaide Central Reinforcement Program)
  • Central Eyre Iron Project
  • Adelaide Desalination Project
  • Glenelg to Adelaide Park Lands Recycled Water Project
  • Western Pipeline Project (Part of the North South Interconnection System Project)
  • Eastern Pipeline Project (Part of the North South Interconnection System Project)
  • Waterloo Substation Replacement Project
  • National Broadband Network First Release Site – Willunga, South Australia

CONSULTATION, RESEARCH AND PLANNING

  • Level Crossing Removal Program – Ovingham and Hove
  • Main South Road Duplication
  • Mitcham Hills Planning Study
  • Adelaide Hills Intersection Upgrade
  • North – South Corridor Future Priorities Planning Study
  • North East Public Transport Study
  • Tonsley Line Review
  • Rail Security consultation
  • Northern Connector Planning Study
  • Northern Economic Plan
  • SA Regional Demographic Study
  • Greenhill Road Safety Upgrade
  • Seaford Rail Extension Planning Study
  • Edinburgh Runway Extension – – Maritime Patrol Aircraft Replacement Project (AIR7000)
  • Transforming Health
  • Integrated Transport and Land Use Plan
  • Regional Mining and Infrastructure Plans
  • Northern Adelaide Demographic Analysis
  • South Road Superway Planning Study
  • Olympic Dam Expansion Environmental Impact Statement
 

Copyright @ 2020 - Gould Thorpe Planning Pty Ltd. Website by Ruciak